ENGEOCOM Working on Complete Highway Interchange Overhaul

ENGEOCOM has completed reconstruction of the highway interchange at the intersection of Ring Road and Ryazan Ave. In December Moscow’s mayor Sergei Sobyanin was on hand to open the transport tunnel to traffic for the first time since construction began. Also at the opening was the Deputy Mayor for urban highway constructionplanning, and the building of Marat Khusnullin, head of the construction department for the city of Moscow Alexey Bochkarev. Also the First Deputy head of the city’s construction department Pyotr Aksenov, as well as the president of the company ENGEOCOM, Dimitri Evseev.

Dimitri and Sergey were on hand to talk about the project. The entire reconstruction of the freeway interchange took 11 months. “In September we opened one overpass here, and in November, the second.” With the completion of the tunnel they will complete the work on all basic functions of the interchange, said Dimitri Evseev, president of ENGEOCOM. The brand new tunnel runs the length of 603 metres and will provide Congress with the counterclockwise roundabout of Lermontov Avenue on the inner side of the Moscow Ring Road. Reconstruction of the entire project, comprises a large set of measures: the construction of the overpass Moscow-Ryazan has a projected length of 178 meters, the overpass Ring – Lermontov avenue has a 168 meter long road tunnel, and 608 meters long pedestrian bridge over the Ryazan prospectus; expansion of Moscow, Ryazan and Lermontov Prospekt; and includes reconstruction of existing conventions with Moscow and relaying the underlying utilities. After the reconstruction of the facility traffic capacity will increase by 25%, which will cut down on traffic and make areas much easier to access.

The aim is to replace one of the “petals” of the traffic “clover” with a decoupling of one of the interchanges. The mayor then noted that the updated interchange will greatly improve the accessibility of the Zhulebino, Nekrasovka, and suburban Lyubertsy areas. This is the 12th upgrade in a series of upgrades at the interchange at Ring Road. It is a complex subject, which, despite all attempts to make it as easy on motorists, has cause a large inconvenience to drivers on the road.

ENGEOCOM has had workers going at maximum speed to try to make the road construction be less obtrusive to the daily lives of motorists as soon as possible. “In recent years, the builders have been working around the clock and have finished the extremely complex construction as soon as possible,” said the mayor. Clearly the intent here is to finish as soon as possible, and the government feels the push to finish this large undertaking as soon as possible.

The mayor thanked the construction workers of all of their good work and gave the command to open up the tunnel in order to let the first traffic through the new interchange.

 

Tour Held for Residents of Underground Station

On Monday, May 15 at the site of “Association” ENGEOCOM the general visit. Right now the development branch of the City of Moscow offered to Muscovites to watch the advancement of work at the station “Khodynka” Third trade circuit of the Moscow Metro.

Members of the tour started with 12 individuals in the capital who have sent the application to the Department of development of Moscow, and also a few individuals from “Association” ENGEOCOM “, whose every day work is related to administrative activities.

Visitors assembled at the headquarters building, which experienced wellbeing preparing and got head protectors and cautioning vests.

In the part of an aide as indicated by tradition was made by the leader of the training and support of the construction of “Association” ENGEOCOM “Dmitry Ivanov.

He drove the members to the tour ditches, where he let them know about the Third interchange circuit.

Dmitry Ivanov reminded the gathering of people that the first segment of the Third interchange circuit will comprise of six stations. Its length, considering the associating strings will be 13.7 kilometers.