New Moscow Metro Expected In 2016

Ernest Rudyak - EngeocomDeputies and General Directors of firms such as “Association” and “ENGEOCOM” visited the site of the project and discussed in great length the progress that has been achieved thus far. The building of the station, dubbed “Khoroshevskaya”, is at full swing and it is expected to be completed late in 2016.

As mentioned above, Khoroshevskaya is part of a much bigger project called the Third interchange circuit, which includes the construction of other railroad and underground stations such as “Business Center”, “Shelepiha”, “Khodynka” and “Peter Park.”

The urgency of building these transportation routes was slowed down due to the preparatory process, which took almost two years, as well as the grand scale of the project. Other setbacks included the change in building methods, which varied from closed to open in order to find the best possible way save money and finish faster. Despite these minor complications throughout the first few stages of construction, General Director for ENGEOCOM stated that close to 3.5 million rubles were saved because of these efforts. 

The difficult geological conditions present at the site of Khoroshevskaya have forced the workers to use a unique type of soil for the surface, which in turn is going to increase the rate of perforation. 

For more information watch the video below: 

https://www.youtube.com/watch?v=D4PVZt_sMbA